NDA On Site

June 17, 2019

Lee Manor

Three Storey Extension

This project raising the gable and full width dormer to another property in the Lee Manor Conservation Area is now on site with Main Contractor MIDA.

June 05, 2019

Greenwich

Three Storey Extension

Currently a concrete box in the ground, this is soon to become a large open plan kitchen at lower ground level to this Victorian villa in Greenwich, width a part width three storey rear extension.

June 05, 2019

Lewisham

Rear Extension

Work is underway on this part below ground floor level extension to the rear of this Victorian home in Lewisham.

November 14, 2018

Lewisham

Oriel window

The oriel window is in place and set, awaiting fine finishing

November 09, 2018

Chislehurst

Topping Out

This new build Queen Anne style house for private clients in Chislehurst has been topped out.

October 23, 2018

Lewisham

Transformation of the pink house

This well prominent home in Lewisham was well known for the previous owner's penchant for brightly coloured masonry paint.

We hope that in years to come it will become known as the house with the glass box, although at present the 2 tonnes of reinforced concrete on site is currently supporting nothing more than a plasterer's paddle drill.

Installation of the structural glass by Glassbuild is imminent.

June 26, 2018

Lee Manor

(Another) Rear extension

The second phase of this project (the ground floor extension) is also underway in Lee Manor.

Main Contractor, MIDA

June 26, 2018

Chislehurst

New Build House

Up to first floor level in Chislehurst on this new build detached house for a private client.

June 26, 2018

Lee Manor

Rear extension

The second phase of this project (the ground floor extension) is underway in Lee Manor.

 

The structural shell is completed with the sliding doors and rooflights imminent.

Main Contractor, Skyroofs

November 02, 2017

Hither Green

Rear extension

The second phase of this project (the ground floor extension) is underway in Hither Green.

 

The old conservatory is down. Trenches dug and poured tomorrow. Steelwork in next week.

November 02, 2017

Lee Manor

Extension to victorian terrace in Lee Manor Conservation Area

Works are progressing on this two storey reconstruction to the side closet wing and infill and rear extension of this Victorian home in Lee Manor.

The ground floor has been opened up to create a large family kitchen, beneath a new, broadened and lengthened first floor, allowing an enlarged bathroom and additional double rear bedroom.

January 05, 2017

The Pentagon

Home Office

Neither a project for either the US Defence Department or Amber Rudd, but a space for myself and Mrs D to work from home.

 

Built at weekends and on fair days by my own (now less than) fair hands.

Windows and door to arrive this month, and the project to be completed in February with another article on the whole process in Mummy's Gin Fund to follow.

July 21, 2016

Men of Steel

Hither Green Job A

The steel frame is in! Expertly fabricated by T Good & Sons and installed by CEM.

July 18, 2016

The pour

Hither Green Job A

The school holidays have not yet begun, but the site crew are cracking on. The rear wall is no more and the reinforced ground beam is being cast ahead of the steel frame, due in a couple of days.

July 10, 2016

A big hole in the ground!

Hither Green Job A

OK... So it doesn't look like much, but this is where it all starts. Trenches dug for foundations and a new manhole located to take all the...err... stuff... outside the footprint of this extension. Concrete to be cast next week, then blockwork up to DPC level. Meanwhile the client is able to remain in occupation with a temporary kitchen until the extension shell flies up and the break though of the existing rear of the house gets formed. Timed perfectly to coincide with the school holidays!

July 03, 2016

Works Commencing

Hither Green Job B

Works have commenced on the first stage of works to this Edwardian house in Hither Green.

June 29, 2016

Breaking Ground

Hither Green Job A

Local contractors Sky Roofs and Build have commenced work on a single storey rear extension in Hither Green, designed by Neel Dakshy Architecture. Look out for stage by stage updates.

Please reload